Skip to content
  • 0 Votes
    1 Posts
    20 Views
    K
    Sarawak’s affordable-housing update sets a 1,410-unit target under the 13th Malaysia Plan, but the nearer completion milestone concerns 402 homes already under construction. Those 402 units are expected to be completed in the second quarter of 2027. Of that group, 157 are to receive solar-energy systems, with the State government bearing half the installation cost, according to the Oct 21 DayakDaily report of the legislative assembly winding-up speech. Second Minister for Natural Resources and Urban Development Datuk Amar Awang Tengah said the Land Custody and Development Authority’s broader 1,410-unit programme carried an estimated construction cost of RM524.9 million. Budget 2027 approved RM213.35 million for the projects. The total estimate and that budget allocation are different figures, not two additional housing programmes. He put the cost of providing a home under the Village Expansion Scheme and Resettlement Scheme at RM350,000 to RM435,000, against a selling price of RM150,000. A land premium of RM2,500 per lot was also cited. Solar installation for the 157 homes was valued at RM4.553 million in total; the 50 per cent State contribution refers to installation, not half the purchase price of a house. For prospective buyers, this is a programme-and-construction update rather than an announcement that all 1,410 homes are ready. It does not set out individual project locations, application dates or eligibility requirements.
  • 0 Votes
    1 Posts
    53 Views
    K
    Sarawak’s Genevie Lim and partner Low Zi Yu have secured Malaysia’s first women’s doubles title at the BWF World Junior Championships, winning the final in Cairo on October 17. They beat a Japanese pair 15–7, 9–15, 15–12, adding a world junior gold to the Asian junior bronze they won in Japan three months earlier. The Sarawak Badminton Association (SBA) said no Malaysian women’s doubles pair had previously won the title since the championships began in 1992. For Sarawak, Lim’s success also highlights a development path that has involved both state and national support. SBA said it continued supporting her after she returned from the national setup and later recommended her return to the Badminton Association of Malaysia. The state association says it will give Lim a special cash reward for the title. No amount was specified in its announcement.
  • 0 Votes
    1 Posts
    42 Views
    K
    The Sarawak Business Federation (SBF) wants the state government to review how the Foreign Workers Transformation Approach (FWTA) is implemented, with particular attention to smaller firms’ compliance costs. Its president, Jonathan Chai, said industries have different staffing needs and operating conditions, while SMEs may have fewer resources to absorb additional costs. He called for continued engagement with businesses so requirements remain practical without weakening the government’s workforce-management objectives. Chai made the appeal at SBF’s anniversary dinner at the Unifor Complex in Kuching on October 17. The request is for an implementation review; it is not an announcement that FWTA has been suspended or that employers’ requirements have changed. He also welcomed the planned Ease of Doing Business Reform Blueprint, saying simpler procedures, quicker approvals and better coordination between agencies should translate into less administrative work for businesses. For employers, the distinction matters: the federation is asking for changes, rather than setting out a new compliance regime.
  • 0 Votes
    1 Posts
    41 Views
    K
    A RM39.2 million upgrade of the Nanga Ngungun–Nanga Bat road is targeting completion in September 2028, improving a rural link in Sarawak’s Ngemah constituency. The project covers 4.2km of former logging road, to be upgraded to R1 standard. It is one section of the wider Nanga Ngungun–Nanga Jagau route, rather than an upgrade of that entire road. The Borneo Post reported that a commencement ceremony was held at Nanga Ngungun on October 17. The Rural and Regional Development Ministry project is being implemented by the Public Works Department (JKR). For communities along the route, the intended benefit is better access between settlements and to essential services. The September 2028 target sets the delivery timetable for those improvements.
  • 0 Votes
    1 Posts
    50 Views
    K
    Sarawak-born Johan “Jojo” Ghazali beat Diego Paez by unanimous decision in Bangkok on October 16, reversing the outcome of their first meeting. The flyweight Muay Thai rematch went all three rounds at Lumpinee Boxing Stadium. Bernama reported that all judges favoured Ghazali after a performance built around controlled punch-and-kick combinations and responses to Paez’s counters. Paez had won their June 2025 bout by split decision. The distinction matters: that first contest divided the judges, while the return bout produced agreement in Ghazali’s favour, not a knockout. For followers of the Sarawak fighter, the result is a win in his ONE Friday Fights 175 and The Inner Circle 35 appearance. It was not a world-title bout.
  • 0 Votes
    1 Posts
    20 Views
    K
    Twenty winning entries from this year’s Sarawak Folklore writing competition have been brought together with 13 stories from DayakDaily’s D’Drift expeditions in a new printed volume. Sarawak Folklore Book I was launched at Imperial Hotel Kuching on Oct 17, according to DayakDaily’s report. Persatuan Wartawan Bebas Kuching (Pewarta) and Amber Publishing House produced the book, working with the DayakDaily team. The collection puts competition writing alongside accounts gathered through field expeditions, giving readers two routes into the state’s storytelling traditions. The organisers describe the move into print as a way to preserve oral narratives, family histories and community roots beyond their digital publication. For local writers, publication gives the winning stories a second home after the contest. For readers, it brings material from different communities into one collection. These are folklore and cultural narratives, rather than a claim that every story is a verified historical record.
  • 0 Votes
    1 Posts
    24 Views
    K
    A cocoa-processing initiative in Kota Samarahan is exploring how Sarawak growers can move beyond selling dried beans to producing chocolate with a distinct local identity. The Malaysian Cocoa Board is processing beans from four locations at a cluster cooperative research centre in Kota Samarahan using a single-origin approach. Bernama reported the board’s account of the work on Oct 17. The remarks were made at the launch of A Malaysian Cocoa Affair 2026 in Melaka. The board said it could bring processing technology to interested farmers and entrepreneurs, with differences in growing areas and processing methods providing scope for different flavours and aromas. The downstream work is separate from the board’s proposal to expand cocoa cultivation in Sarawak. New trees would first need to bear fruit, with additional local supplies envisaged over the next two to three years rather than immediately. For growers, that separates two different opportunities: adding value to beans through processing, and the longer wait involved in expanding production.
  • 0 Votes
    1 Posts
    22 Views
    K
    Batang Saribas 2 Bridge is expected to open to traffic on Dec 5, giving the Pusa area another major link in Sarawak’s road network. The 2.43-kilometre crossing is not yet being reported as open. The date was announced in the Sarawak Premier’s speech at Regatta Tandang Sari in Pusa on Oct 17, delivered on his behalf by the Deputy Premier, DayakDaily reported. It is a planned opening, rather than an announcement that motorists can already use the bridge. For Pusa’s farming and fishing communities, the practical importance is access to markets: the speech linked better roads and bridges with easier movement of produce, business expansion and visits to the district. It did not put a figure on journey-time savings. Batang Saribas 2 should also be distinguished from Batang Saribas 1, the separate crossing already in use. Travellers planning a December journey will need the final traffic-opening notice for the new bridge, not just the target date announced at the regatta.
  • 0 Votes
    1 Posts
    27 Views
    K
    Sarawak students Matthew Cheong and Timothy Cheong have taken second place in the RoboMission Junior category at the World Robot Olympiad (WRO) 2026 Open Championship Europe in Zagreb, Croatia. The brothers, who attend Borneo International School, competed as team “Malaysia Boleh”. DayakDaily reported their result on Oct 17, following the championship held from Oct 13 to 16. The result is a category placing at the Europe open championship, rather than a claim to an overall WRO world ranking. Their preparation took place closer to home: Miri-based robotics centre TESSLAB trained the team in robot design, coding and competition strategy. The Sarawak government supported their participation through the Ministry of Education, Innovation and Talent Development and Sarawak Digital Economy Corporation. The championship drew more than 220 teams from 45 countries. The brothers’ result gives Sarawak’s school-age robotics scene an international competition milestone, with local training and state-backed participation both part of the route to Zagreb.
  • 0 Votes
    1 Posts
    27 Views
    K
    Japanese company HighChem is considering Sarawak for a pilot involving technology to turn carbon dioxide into paraxylene, a feedstock used to make polyester. The proposal is an additional route being explored for the state's petrochemical industry, not an announced operating plant. Sarawak's Deputy Minister for Energy and Environmental Sustainability outlined the idea at the ASIA-TECH forum in Bangkok on October 7. He said the state's downstream plans would depend on technical feasibility, competitive production costs, market demand and cooperation between industry players. The location distinction matters: Sarawak was identified for the proposed carbon-dioxide pilot, but a specific site was not given. Bintulu Petrochemical Industrial Park was named for a separate proposed syngas-to-ethylene glycol plant covered by a HighChem–Sarawak Petchem memorandum of understanding. The two proposals should not be treated as the same plant. For Sarawak's industrial suppliers and workers, the next useful detail is whether the pilot gains a defined site and implementation plan. The October 8 report did not announce a start date, production capacity or investment amount for this particular pilot. It also did not establish that the process is already commercially viable in Sarawak.
  • 0 Votes
    1 Posts
    25 Views
    K
    The Batang Paloh Bridge is scheduled to open to traffic on October 30, giving Bruit Island and Tanjung Manis a new road crossing along Sarawak's coastal corridor. The announcement follows the joining of the bridge's final structural sections on October 8; it is not an announcement that motorists can use it today. JKR Sarawak said the 1.7-kilometre bridge would provide an alternative connection between Mukah, Sibu and Sarikei, complementing the Pan Borneo Highway. The project also includes about 4.6 kilometres of connecting roads on the island and Tanjung Manis sides. For communities that rely on the ferry, the change is a direct road connection rather than another sailing option. JKR expects it to reduce reliance on ferry services and improve access to schools, healthcare and government offices. Those are expected benefits after opening, not measured travel-time results from an operating bridge. The project has a reported contract value of RM298.98 million. The October 8 stitching ceremony marked the completion of a continuous structural crossing over Batang Paloh. Travellers planning a coastal journey should keep the announced October 30 opening separate from this construction milestone; the report did not specify a first-day opening hour.
  • 0 Votes
    1 Posts
    30 Views
    K
    Sarawak's electoral-boundary review received 126 objections and seven submissions supporting the proposed recommendations during the September exhibition. The Election Commission will now examine all 133 representations at a special meeting before determining the local-inquiry process. The EC set out that next stage in an October 8 statement, following the exhibition from September 1 to 30. Particular attention will go to representations that meet the requirements for consideration at a local inquiry. Submitting an objection is not the same as having it accepted for an inquiry. Eligible parties are to receive attendance notices at least two weeks before proceedings, but the statement did not announce an inquiry date or say that all 126 objections qualify. For Kuching and other Sarawak voters, this is a procedural update rather than confirmation of new constituency boundaries. The review runs within a two-year period beginning September 1, 2026, and is to conclude with a final report submitted to the Prime Minister. The special meeting and notices are the next steps to follow; final boundaries were not announced in this update.
  • 0 Votes
    1 Posts
    31 Views
    K
    SoftBank, Grab and PETROS have signed a framework agreement to explore an AI and digital-infrastructure platform in Sarawak. The next task is to develop a roadmap for a phased project, not to open an already-built facility. In a statement reported on October 8, the three companies said they would assess opportunities in AI computing and services, advanced technology, robotics, and local workforce and community development. SoftBank would contribute its technology and AI ecosystem, Grab its regional digital networks and applied AI capabilities, and PETROS its energy and infrastructure experience. The agreement is an initial step. The announcement did not give an investment amount, a construction timetable, a specific project site or an opening date. The October 8 document exchange at Satria Pertiwi Complex in Kuching should not be mistaken for the location of the proposed platform. For Sarawak businesses and workers, the useful distinction is between the areas the partners want to explore and projects actually committed to delivery. A more definite picture will depend on the roadmap and scope they develop; no procurement opportunity, recruitment programme or guaranteed job total was announced.
  • 0 Votes
    1 Posts
    53 Views
    K
    The new road from Teku Pasai Siong to Kemuyang in Sibu is targeting completion in September 2027, with an elevated arch section designed to carry the route across swampy ground. An October 8 report on the Public Works Department's latest update puts Package 1 at 6.172 kilometres. Within that road package, the elevated arch structure is described as 704 metres long. The two figures refer to the full new-road package and one particular structure, not two alternative measurements of the same section. JKR says the elevated design addresses soft ground and the risk of settlement. The point of the raised section is therefore the terrain it crosses, rather than an extra river crossing. The route is intended to improve access between the Teku Pasai Siong and Kemuyang areas once finished. The department's director discussed the engineering approach in an October 7 social-media update following a recent site inspection. DayakDaily reports that construction is progressing according to schedule, but gives no numerical completion percentage or public opening date. September 2027 remains the construction target. The update does not mean the new route is open to motorists, and it supplies no present-day journey-time figure to compare with the existing roads.
  • 0 Votes
    1 Posts
    56 Views
    K
    Sarawak's planned Quantum Safe Centre is intended to help organisations prepare their existing encryption systems for post-quantum requirements, rather than provide a new quantum-computing service. IBM Malaysia and the Sarawak Artificial Intelligence Centre (SAIC) set out the collaboration in an October 6 announcement. They plan a centre supporting research, skills development and practical adoption of quantum-safe technologies, with potential programmes for SMEs, larger businesses and public-sector agencies. One proposed tool is IBM Guardium Cryptography Manager. The partners say it would help organisations identify and inventory the cryptography they already use, prioritise risks and prepare changes. That places the emphasis on understanding existing systems before a transition, not on a claim that Sarawak's networks have already been upgraded. For local businesses, the planned customer programmes and demonstrations are the part to watch. The announcement does not give a centre address, opening date, enrolment process or service prices. Its wording remains a plan to establish the facility and explore services; it does not establish that an organisation can book them now. The partnership also aims to develop technology talent across East Malaysia. No completed migration, tested security result or guarantee against cyberattacks was announced.
  • 0 Votes
    1 Posts
    38 Views
    K
    Telok Melano has been surveyed as a possible location for a sea-launch facility, but the proposal remains exploratory rather than an approved construction project. Angkasa X's executive chairman described the idea at an IDECS panel discussion in Kuching on October 6. He said the facility could eventually support satellites assembled in Sarawak, while stressing that a launch facility would only make economic sense if the state first developed enough satellite capability and activity. That puts the proposed site within a wider chain of work: satellite research, ground stations, assembly, data processing and commercial applications. These are different functions; identifying a potential launch location does not establish that a working satellite or launch operation is ready. For Telok Melano, the concrete development disclosed so far is the survey. No final approval or facility timetable was announced during the session. The report also does not identify the exact surveyed plot, a construction budget or any public-access changes, so the announcement should not be read as notice of building work or a new restriction in the area.
  • 0 Votes
    1 Posts
    40 Views
    K
    A licensed crocodile-hunting team captured three crocodiles near Ulu Kampung Kebuaw in Batang Igan on October 4, 5 and 6, with the largest measuring 4.75 metres. The largest was caught at about 2.30am on October 6 and was estimated to weigh 500kg, the team leader told Bernama. The other two measured about 2.44 metres and 2.74 metres. His four-member team had begun the operation on October 3 following requests from residents concerned about repeated sightings. The team also found a nest containing around 40 eggs. Villagers helped with the operation, including lifting the largest crocodile into a boat, and the team leader acknowledged cooperation from the Sarawak Forestry Corporation. These are captures at a particular stretch near the village, not a clearance of crocodiles from Batang Igan. The reported size, estimated weight and capture dates describe the animals removed; they do not establish that the river is now safe or free of other crocodiles.
  • 0 Votes
    1 Posts
    28 Views
    K
    A new preschool classroom building at SJK Su Ming accounts for RM200,000 of a RM450,000 facilities allocation for six Meradong schools. The remaining five projects each receive RM50,000 under the Sarawak Rural Transformation Programme (RTP), according to the Meradong assemblyman's account reported by TVS and carried by DayakDaily on October 6. The package covers a parking facility at SJK Tanah Putih, improvements to SK Rentap's multipurpose hall and ICT room, fencing at SJK Yong Kwong and SJK Tong Hua, and electrical rewiring at SJK Yong Cheng. These are school-specific works rather than an equal division of the total among all six schools. The announcement followed the handover of site approval for the projects in Meradong that day. Approval and funding do not mean the new classroom and other facilities are already ready for use: the report gives no construction-completion dates or revised arrangements for pupils during the works.
  • 0 Votes
    1 Posts
    32 Views
    K
    Farm-access road projects in Kampung Pichin, Kampung Jenan and Kampung Payau Burus have been completed and handed over, with a combined cost of RM450,000. The three Tebedu projects fall under the Rural Transformation Project (RTP). A Sarawak Public Communication Unit report, carried by DayakDaily, records the handover of the sites and project documents to the respective community chiefs at all three locations on October 6. These are agricultural access roads, aimed at helping farmers and smallholders reach their land and move produce out of farms and plantations. They are not an announcement of a new main-road link or a general road upgrade throughout Tebedu. The Serian Department of Irrigation and Drainage was represented at the handovers. RM450,000 is the total for the three projects, not the cost of each road. The report does not give individual road lengths, separate contract values or measured savings in transport time.
  • 0 Votes
    1 Posts
    42 Views
    K
    Pa Lungan's utility improvements and road works are moving at different speeds: 47 households now have clean water, electricity and telecommunications connectivity, while the road upgrade is 4.7 per cent complete. The update followed an October 6 monitoring visit to the remote Bario community. In a statement after the visit, the deputy minister responsible for project monitoring said the road works remained on schedule. Electricity is supplied through the Sarawak Alternative Rural Electrification Scheme (SARES). The water facility and telecommunications connection are reported as amenities already benefiting residents, rather than services waiting for the road to be finished. For the village, that distinction matters: access to basic utilities has improved, but the road project is still at an early construction stage. The update gives no road completion date, project cost or telecommunications service speed; it does not establish a fully upgraded access route.