Skip to content
  • 0 Votes
    1 Posts
    29 Views
    K
    Sarawak and Sabah paddy farmers are to be included in the RM300 ploughing incentive under Budget 2027. The Prime Minister and Finance Minister announced the expansion in the Dewan Rakyat on October 9, alongside a doubling of the harvesting incentive from RM50 to RM100 per hectare per season. The two measures cover different farming costs: preparing the land and harvesting the crop. The federal budget provides RM2.62 billion in overall assistance for rice farmers. The minister described support of around RM4,300 per hectare across seed, fertiliser, pesticide and ploughing subsidies, together with paddy price support. That figure is a package of support measures, not an announced single cash payment of RM4,300 to every farmer. The report does not set out an application window or the detailed eligibility and payment arrangements for the expanded ploughing incentive. Sarawak growers therefore have a new inclusion announcement, but not yet the operational details needed to establish what a particular farm can claim.
  • 0 Votes
    1 Posts
    30 Views
    K
    Nearly RM1.3 billion is allocated in Budget 2027 to upgrade 682 dilapidated schools, with Sabah and Sarawak receiving particular attention. The Prime Minister and Finance Minister announced the funding when presenting the budget in the Dewan Rakyat on October 9. The 682 figure covers the announced programme; it is not a count of schools in Sarawak alone. A separate allocation for repairs and maintenance across all types of schools will double from RM1 billion to RM2 billion. The dilapidated-school upgrade programme and wider maintenance funding should therefore not be read as the same pot or added together as a confirmed Sarawak entitlement. For families and school communities in Sarawak, the announcement sets out the scale and regional priority of the upgrade programme, but does not identify which local schools will receive work or when their projects will finish. Those school-level allocations and construction schedules will determine how the funding changes pupils’ day-to-day learning conditions.
  • 0 Votes
    1 Posts
    28 Views
    K
    Budget 2027 allocates RM3.3 billion to ongoing highway projects in Sabah and Sarawak, including the Trans-Borneo Highway and Sarawak–Sabah Link Road 1. Presenting the budget in the Dewan Rakyat on October 9, the Prime Minister and Finance Minister said the Letter of Acceptance for the Trans-Borneo Highway’s Miri section had been issued. The Limbang and Lawas sections were expected to receive theirs by the end of 2026. That separates a confirmed award step in Miri from an expected step in the other two areas. Sarawak–Sabah Link Road 1 and Sabah’s Pan Borneo Highway Phase 1B are targeted for completion by the end of 2027. The announced deadline applies to those two projects, not automatically to every Trans-Borneo Highway section. The budget also sets aside RM350 million for federal road maintenance by G1–G4 contractors in Sabah and Sarawak. Maintenance funding and the highway development allocation address different work; neither announcement means a new section is already open to traffic. For northern Sarawak road users, the next concrete milestones are the outstanding Limbang and Lawas acceptance letters and progress towards the Link Road 1 completion target. The RM3.3 billion is a combined allocation for both states, not a Sarawak-only sum.
  • 0 Votes
    1 Posts
    42 Views
    K
    Sarawak’s contribution to a new African swine fever research partnership will centre on virus data and local veterinary experience, rather than an announced farm treatment or finished vaccine. The Sarawak Infectious Disease Centre (SIDC) said on October 8 that it is joining a £3.4 million project led by the University of Sheffield. The partnership also includes the University of Liverpool and Thailand’s National Center for Genetic Engineering and Biotechnology, with SIDC working alongside Sarawak’s Veterinary Services Department. The researchers aim to understand the virus’s genetic diversity, evolution and spread. Whole-genome sequencing is intended to help build SIDC’s role as a regional genomic reference centre and produce evidence useful to farmers and veterinary authorities. UK Research and Innovation’s October 7 funding announcement independently lists the Sheffield-led African swine fever project among 18 new research and innovation projects. The £3.4 million figure is the partnership’s reported project grant, not an allocation confirmed wholly for SIDC. For Sarawak’s pig-farming sector, the local link is participation in generating and interpreting evidence about the virus. The announcement sets out research goals; it does not establish that a new vaccine, treatment or control service is ready for farmers to use.
  • 0 Votes
    1 Posts
    25 Views
    K
    Sarawak’s fourth cloud-seeding operation of 2026 runs from October 8 to 10, but the programme does not put every target dam on the same flight schedule. The Sarawak Public Communication Unit said the first day focused on Zone A: Bakun and Murum in Belaga, and Sika and Assyakirin in the Bintulu area. The operation is intended to support rainfall over dam catchments. Bengoh, near Kuching, and Batang Ai fall under Zone B. Flights there were planned for reconnaissance first, with subsequent cloud-seeding decisions taking account of the survey findings. The initial sequencing reflects concern that seeding drift could cross into Kalimantan’s airspace. For Kuching readers, Bengoh’s inclusion identifies a nearby target catchment; it is not confirmation that seeding there has already been completed. The October 8–10 operation window also should not be read as a promise of rain at a particular neighbourhood or time. This is a separate operation from the earlier September programme. Its immediate focus is the dam catchments, while the useful follow-up will be where seeding actually takes place and what rainfall and reservoir-level changes are subsequently recorded.
  • 0 Votes
    1 Posts
    33 Views
    K
    Miri Airport’s planned expansion is being shaped around two goals: handling more passengers and giving the terminal a recognisably local identity. Sarawak Transport Minister Dato Sri Lee Kim Shin said the RM445 million project, approved in April, is expected to raise annual passenger-handling capacity from about two million to four million. That is a target for the upgraded airport, not its current operating capacity. At a design engagement in Miri on October 8, Lee called for the interior to reflect the art and craftsmanship of the Orang Ulu community, including the heritage of Miri, Baram and the Kelabit Highlands. He stressed that cultural elements must be represented accurately and respectfully, while keeping the terminal safe, accessible and efficient. The October 7–9 engagement brings together the federal Public Works Department project team, cultural associations, artists and local craftspeople to gather views on the proposed interior concept. Local input is therefore being sought while the design is taking shape, rather than simply selecting decorations for a finished terminal. For travellers using northern Sarawak’s air gateway, the capacity figure concerns the airport’s ability to handle passengers. It does not establish new airline routes or additional flight frequencies; those are separate from this terminal-design consultation.
  • 0 Votes
    1 Posts
    30 Views
    K
    A vehicle owner unable to reach a JPJ counter for health reasons received a home visit in Sarikei for the thumbprint verification needed for an ownership transfer. Two officers from JPJ Sarikei's Vehicle Licensing Division carried out the check on October 7, following a request from the registered owner. JPJ Sarawak described the visit in a statement reported by TVS on October 8 and said it would continue expanding mobile-thumbprint services. The service brings the identity check to the owner; it does not remove the ownership-transfer requirements. That distinction matters for families helping someone who cannot readily travel to a counter. The Sarikei case gives those families a specific service to ask JPJ about before arranging a trip. It is not a promise that every request will qualify: the announcement did not set out statewide coverage, application steps, fees or waiting times. Arrangements for an individual owner still need to be confirmed with JPJ.
  • 0 Votes
    1 Posts
    37 Views
    K
    Kuching still does not have enough hotel rooms to meet demand, the Sarawak Premier told reporters on October 6, putting the city's overall inventory at roughly 13,000 rooms. He said some visitors had to turn to homestays and linked the pressure to business events and major conferences choosing Kuching. He made the remarks after a hotel opening in the city. The 13,000 figure describes the overall stock of hotel rooms, not how many rooms are vacant for a particular visit. The Premier said more detailed and updated figures could be obtained from the state tourism minister. His remarks did not quantify the shortage or provide date-by-date occupancy figures. For conference organisers and travellers, the distinction is practical: the citywide total cannot establish availability on their event dates. Nor did the remarks specify room rates or how many additional rooms would be needed. More hotels can add to the stock, but the reported pressure concerns whether accommodation matches demand when visitors arrive.
  • 0 Votes
    1 Posts
    31 Views
    K
    Kuching is included in a Hong Kong–Singapore fibre-optic network project, with an agreement signed for Sarawak's participation, according to Converge ICT Solutions Inc's chief executive. Speaking after an IDECS meeting in Kuching on October 5, the executive said Sarawak Digital Economy Corporation (SDEC) initiated the project and would invest in a connection with a branch to Kuching. The wider network would run for more than 3,000 kilometres and also have branches to the Philippines and Thailand. For Sarawak, the proposed connection is about access to regional digital hubs, rather than a new household broadband package. The executive linked the investment to the high-capacity connections needed by data centres, cloud computing and AI, with Singapore providing onward links to other networks. A signed agreement is not the same as an operating connection. The account gives no commissioning date, network capacity or retail service terms, so it does not establish when Kuching users would gain extra bandwidth or whether their broadband prices would change. BCCK was the meeting venue; the precise Kuching connection site was not identified.
  • 0 Votes
    1 Posts
    55 Views
    K
    The arched roof on Jalan Channel is a useful first clue: Sibu Central Market is a large working building, not a row of souvenir stalls dressed up for visitors. I would start downstairs rather than head straight for breakfast. The rows of produce counters explain why this address matters to Sibu; the meal upstairs makes more sense once you have seen what comes through the market below. [image: 1791243315969-130941995-resized.jpg] Pangalau / Wikimedia Commons · CC BY-SA 4.0 · 2023 photograph, unchanged. The present Central Market was completed in 1996. It brought the former wet market and the Lembangan native market together in one complex opposite the express-boat passenger terminal. That change is more interesting than a claim about being the biggest market: an everyday town shopping stop and a trading place for indigenous produce were brought to the same address. You can read that purpose in the mix of vegetables, fruit, poultry and handicrafts, rather than looking for a ceremonial monument to it. I would give the ground floor the unhurried part of the visit. Jungle produce and local vegetables are not decorations for a cultural display; they are things people buy. Iban vendors and the wider mix of traders make the market a place where Sibu's different food traditions share the same practical space. Availability follows the day's supply, so treating a particular fruit or forest ingredient as a guaranteed attraction would miss the point. [image: 1791243316647-138294972-resized.jpg] Wee Hong / Wikimedia Commons · CC BY-SA 4.0 · September 2023 photograph, unchanged. There is one detail that is hard to mistake for another town's polished food hall: live chickens sold with their bodies enclosed in newspaper tubes, their heads visible above the paper. The packaging is a distinctive local trading practice, not a performance arranged for a camera. It is worth noticing because it keeps the connection between an animal, a purchase and a household kitchen visible—something neatly packaged supermarket poultry removes from view. That also sets a real limit on the recommendation. Anyone uncomfortable around live poultry may prefer to avoid that section. I would not turn the animals into a handling activity, and I would ask before making a close-up photograph of a seller. These are working counters with customers to serve. [image: 1791243317332-170497228-resized.jpg] Wee Hong / Wikimedia Commons · CC BY-SA 4.0 · September 2023 photograph, unchanged. The second part of the route is upstairs, where food and drink stalls sit alongside clothing and other merchandise. Downstairs is the buying; upstairs offers somewhere to pause over breakfast. I like that two-level sequence because it prevents a market visit from becoming just a hunt for a famous bowl of noodles. Kampua can be part of the morning, but the stronger reason to come is to understand how ingredients, trade and meals occupy the same building. The older interior photograph below is from 2008, not a promise about today's stall arrangement. Together with the 2023 views, it helps show the long-running role of the open trading floor. The building has been maintained and sections can change; individual stalls should not be treated as permanent exhibits. [image: 1791243317674-16109910.jpg] Benjy8769 / Wikimedia Commons · CC BY-SA 3.0 · 2008 archival photograph, unchanged. For a first Sibu trip, I would use this as the morning anchor of a town-centre walk, then continue towards Tua Pek Kong Temple and the riverfront. Add the Heritage Centre only after checking its opening day. The market is worth an intentional stop for someone interested in food supply and everyday Sarawak, but I would not make a special journey from Kuching solely for it. If your ideal outing is a quiet, air-conditioned gallery or an evening souvenir-shopping circuit, choose a different anchor. Find it on Jalan Channel, Sibu: Sibu Central Market on Google Maps. The market trades daily from early morning, around 6am, but that does not mean every section keeps the same hours. I would arrive in the morning for produce and breakfast, keep about an hour flexible, carry small cash and drinking water, and wear shoes that cope with wet-market floors. Follow any temporary barriers rather than assuming every aisle is open. The most useful souvenir may be a better understanding of what Sibu buys for an ordinary day.
  • 0 Votes
    1 Posts
    31 Views
    K
    A chip designed by a Sarawakian and made at a Sarawak-based foundry has been purchased for use in electric meters to be marketed in China, the Premier said on October 3. The update, delivered in Mukah, places both the design and manufacturing work in Sarawak. China is the intended market for the meters, rather than the location identified for making the chip. No chip model, buyer, order value or quantity was specified in the update. It therefore establishes a reported commercial use, but does not provide enough detail to measure the size of the business or say when the meters will reach customers. There is a separate, documented background to Sarawak’s work in this field. On August 13, SMD Semiconductor and Jiangsu Linyang Energy signed an agreement to evaluate and integrate semiconductor solutions into smart-meter and battery-storage products. That collaboration included technical qualification before commercial deployment. The October remarks did not identify the purchased chip as an SMD product or link it to that agreement. Keeping those developments separate matters: an industry partnership and a reported purchase are different milestones, and neither supplies the missing order figures.
  • 0 Votes
    1 Posts
    23 Views
    K
    Sarawak is still calculating the house types and costs for its planned middle-income housing initiative, with the first pilot intended for Jepak and an area next to Kampung Nyalau in Bintulu. The Premier’s October 3 update identified the second area near Samalaju and said affordability would be tested in Bintulu before the approach was extended elsewhere. Kuching, Miri and Sibu were among the urban areas mentioned for a possible later expansion. For middle-income households in Kuching, that makes this a policy-development update rather than a local housing launch. The remarks did not give a final selling price, application window or construction timetable. The initiative addresses a gap for families who may not qualify for lower-income affordable housing but cannot comfortably buy higher-priced homes. In Bintulu, the Premier identified expensive land and densely developed areas as obstacles that the pilot must address. The idea was first outlined in February, when a RM300,000–RM550,000 price range was being explored. That earlier range is not a newly confirmed October selling price: the current formula is still being worked out, and wider expansion depends on the pilot producing homes within an affordable range.
  • 0 Votes
    1 Posts
    22 Views
    K
    Keys to the first 22 Rumah Spektra Permata (RSP) homes in Balingian were handed over on October 3, while another 32 units are planned for the remaining lots. The completed homes at the Balingian Village Expansion Scheme are two-storey detached units with three bedrooms and two bathrooms, measuring 850 square feet. The first-stage package, including infrastructure, was completed on April 14 after work began on April 19, 2024. The key ceremony is therefore a handover milestone, not the date all construction finished. Each home is sold at RM150,000. The state provides RM10,000 in deposit assistance, leaving RM140,000 to be financed through Mutiara Mortgage & Credit. That balance is financing, not a second subsidy or a promise of the same monthly repayment for every buyer. The wider RSP approach provides infrastructure, electricity and water alongside housing rather than allocating residential lots alone. Housing Development Corporation’s programme information prioritises recipients of lots under village extension and resettlement schemes; this handover is not an announcement of unrestricted sales to all home-seekers. The proposed additional units would bring the Balingian scheme to 54 homes. They are separate from the 22 completed units, and no completion date for the next stage was given in the handover update.
  • 0 Votes
    1 Posts
    41 Views
    K
    People still unable to use WhatsApp should use its official appeal and support channels, the Malaysian Communications and Multimedia Commission said on October 3. MCMC said Meta had told it that a technical error wrongly treated legitimate activity as rule violations. The error affected more than half of the cases in the first batch the commission referred to the company — not more than half of all Malaysian WhatsApp users. According to Meta’s response, the error was fixed at the end of September and affected legitimate accounts were restored, including some whose users had not appealed. That update does not mean every outstanding suspension has been resolved; MCMC said it would continue monitoring the remaining cases. For Kuching traders who use WhatsApp to take orders or contact customers, the separate business-messaging guidance is important. Sending high volumes of messages or contacting people without consent can be detected as spam. MCMC advised businesses to obtain recipients’ consent before sending bulk messages. Meta also said WhatsApp’s enforcement policies and terms of service had not changed. MCMC has asked for clearer appeal confirmations, review-status updates and faster recovery processes so users are not left guessing about their accounts.
  • 0 Votes
    1 Posts
    31 Views
    K
    Sarawak households and businesses will have to wait for the coming State Budget for details on electricity tariffs, Premier Abang Johari Tun Openg said in Mukah on October 3. He said the Budget would set out the state’s revenue outlook and electricity-tariff direction during the coming Sarawak Legislative Assembly sitting, scheduled for October 12–21. His remarks did not set out a new rate, an effective date or which customer categories would be affected. That distinction matters for anyone planning household expenses or business operating costs: a promise to explain tariff policy is not itself an announced increase or a guarantee that charges will stay unchanged. Abang Johari put state revenue at about RM14 billion, compared with roughly RM6 billion to RM7 billion under an earlier administration. He linked the stronger revenue base to Sarawak’s ability to fund its own development projects rather than rely entirely on federal assistance. The next concrete details will be in the Budget presentation — the proposed spending, revenue assumptions and any specific electricity measures. The October 3 speech did not provide the full allocations or tariff schedule.
  • 0 Votes
    1 Posts
    32 Views
    K
    Debak’s maternal and child health services will move temporarily to an improved building behind the existing health clinic while a RM11 million redevelopment goes ahead. The replacement project will remove ageing timber blocks and provide a two-storey concrete building. The maternal and child health unit is planned for the ground floor, with the dental clinic upstairs. Dental chairs, oral X-ray equipment, air-conditioning and electrical works form part of the package. The implementation period runs from July 27, 2026, to March 26, 2028 — 20 months. That is a construction timetable, not an announcement that the new facilities are already open. The temporary maternal and child health premises have been improved by the Sarawak Health Department to keep services available during construction. For families in Debak and nearby communities, the immediate change is where care is provided; the larger building and additional equipment come later. The development is intended to complement the clinics in Pusa and Spaoh and Betong Hospital. Staffing and equipment will still be needed alongside the new building, while a proposed expansion of the surrounding area to address parking remains separate from the confirmed construction scope.
  • 0 Votes
    1 Posts
    41 Views
    K
    A Sibu study is examining how Sarawak’s stormwater-management requirements can be applied to developments on soft ground. The Department of Irrigation and Drainage (DID) Sarawak brought agencies, councils, developers and engineering professionals together at Wisma Sanyan to discuss compliance with the Sarawak Urban Stormwater Management guidelines, known as SUStoM. Their technical feedback will inform the study. SUStoM already forms part of development control. It covers planning submissions, earthworks and erosion-and-sediment control, followed by stormwater engineering plans. The Sibu discussion concerns how those requirements work under local ground conditions, rather than an announced exemption from drainage standards. Complete technical submissions and timely assessments were among the priorities raised. For developers and surrounding neighbourhoods, the issue links approval efficiency with drainage and flood protection. The latest statement did not announce revised requirements or a date for adopting any changes.
  • 0 Votes
    1 Posts
    38 Views
    K
    Mukah’s Basong Water Treatment Plant expansion is 15.1% complete, with completion targeted for September 2028. The RM243.98 million Phase 3 project is designed to add a new plant producing 60 million litres a day, taking Basong’s total treatment capacity from 60 million to 120 million litres daily. It also includes an 18km raw-water pipeline with a diameter of 1,000mm. The October 2 progress update puts the state-funded project ahead of schedule. Construction began in September 2025; the additional capacity is still being built, rather than already supplying households. The expansion is intended to meet future residential and industrial demand in Mukah Division. Raw-water availability remains part of that planning, particularly during dry periods when intake conditions can affect treatment operations. Sarawak’s wider water-grid planning also includes a central-region system covering Mukah, Sarikei, Sibu and Kapit. Rural areas that cannot yet connect fully to the grid continue to be served through alternative water-supply arrangements.
  • 0 Votes
    1 Posts
    39 Views
    K
    Sarawak wants permission to recruit doctors directly, but that change still needs federal agreement. Deputy Premier Dr Sim Kui Hian said in Kuching on October 2 that he would seek a meeting with the Health Minister to discuss recruitment policy, funding and postgraduate training opportunities together. The meeting date depends on the minister’s availability. The discussion goes beyond offering higher payments to attract doctors. Dr Sim said opportunities to train as specialists also matter to doctors deciding where to work, and should be part of a longer-term response to Sarawak’s staffing needs. He also wants the discussions to consider employing foreign medical graduates who studied in Malaysia but cannot currently be employed here. That remains a policy proposal. For hospitals and patients, the distinction is important: this is a proposal to change how personnel can be recruited, not an announcement that new doctors have been appointed. No direct-recruitment approval or start date was announced in the October 2 remarks.
  • 0 Votes
    1 Posts
    39 Views
    K
    A RM95 million upgrade of the Kampung Semeru–Kampung Kuhom link road has begun, with completion targeted for May 2028. The route serves nine villages in the Tebedu and Tarat constituencies. The project is under the Greater Kuching Coordinating Development Agency (GKCDA), with Sarawak’s Public Works Department (JKR) implementing the work. Its stated construction period is 24 months. The upgrade is more than resurfacing: it includes work to JKR R3 standards, realignment of hazardous sections and bends, new road sections, drainage and related structures. These are the changes intended to improve access to facilities and local economic activities once the project is completed. The villages covered are Kampung Semeru, Kampung Bukit Nanas, Kampung Plaman Dunuk, Kampung Senah Rayang, Kampung Padus Stubot, Kampung Bisira Rayang, Kampung Kuhom Mawang, Kampung Kuhom Mandeg and Kampung Rudan. An earth-breaking ceremony was held in Semeru on September 30. The May 2028 date is the project’s completion target, not an announcement that the improved route is already ready for use.