Skip to content

News 📰

800 Topics 802 Posts

Verified Kuching and Sarawak news with local context. Reports combine attributable sources, explain why each development matters to residents and are reviewed for factual corrections after publication.

This category can be followed from the open social web via the handle [email protected]

  • 0 Votes
    1 Posts
    19 Views
    K
    Another 522 participants have obtained B2 motorcycle licences through the Miri parliamentary service centre’s driving-licence assistance programme. The centre says more than 2,700 people have qualified since the scheme began in 2024. The latest group received their licences at a presentation ceremony last week, The Borneo Post reported on Oct 23. The 522 figure refers to that group; the larger total is the programme’s cumulative reach, not a second batch of new recipients. Miri MP and Deputy Tourism, Arts and Culture Minister Chiew Choon Man said in a statement that the programme was intended to make licensing more affordable, particularly for people in need, and help them access employment and additional income. This is a report of completed licences, rather than an announcement of a new application round. No new registration deadline or exact participant fee accompanied the update. Chiew also reminded recipients to obey traffic rules and wear a properly fastened, Sirim-approved helmet: the assistance lowers the barrier to obtaining a licence, but does not remove a rider’s road-safety responsibilities.
  • 0 Votes
    1 Posts
    17 Views
    K
    Petroleum Sarawak Berhad (Petros) plans 10 exploratory oil and gas wells across nine promising onshore areas, with an estimated investment of RM500 million. Balingian, Limbang-Lawas, Marudi and Niah are the named drilling areas. The programme was outlined in the Sarawak Ministry of International Trade, Industry and Investment’s winding-up at the State Legislative Assembly on Oct 21, DayakDaily reported. It is intended to identify new reserves using advanced technology. The nine areas and 10 wells describe an exploration programme, not nine confirmed discoveries or 10 producing wells. Likewise, RM500 million is the estimated investment attached to the plan, rather than a reported sum already spent. The state also identified Miri, Samalaju, Bintulu and Kuching as gas-development hubs. That is a separate geographical list: Kuching’s inclusion as a hub does not put one of the announced onshore drilling areas in the city. For Sarawak engineering, fabrication, maintenance and logistics firms, the ministry linked wider oil and gas development to potential work opportunities and local participation. Those prospects remain different from contracts already awarded; the update did not set out individual well start dates or tender openings.
  • 0 Votes
    1 Posts
    17 Views
    K
    Kuching’s Chung Hua Middle School No. 4 is earmarked to move from Jalan Haji Taha in Satok to a new campus in the Stampin Resettlement Scheme. The latest update concerns land and relocation support, not an immediate transfer of classes. Deputy Premier Dr Sim Kui Hian said the state had reserved a parcel of land for the school and was providing compensation and grants to help with the move, The Borneo Post reported on Oct 22. No relocation date, campus completion target or amount for that support was set out. Sim spoke at a flood-mitigation project groundbreaking in the resettlement scheme. That ceremony should not be confused with the start of construction on the school’s future campus. The school has separately told families that the new site remains a planning project and that teaching will continue at the existing campus in the meantime, according to See Hua Daily News. It said a move would be arranged only when the new site has complete teaching and administrative facilities. For parents considering enrolment, the important distinction is between a site reserved for future expansion and the campus where classes are being held now. The land-and-support announcement does not itself change the school’s present address.
  • 0 Votes
    1 Posts
    16 Views
    K
    RM2.6 million has been allocated to the federal Youth and Sports Ministry for sports-facility upgrades in Sarawak in 2027, but that is not a confirmed RM2.6 million project award for Julau. TVS reported the allocation following a Dewan Rakyat reply on Oct 22. Proposals to build or upgrade facilities in the Julau parliamentary constituency must first be coordinated with the Sarawak Youth and Sports Department and the state government before the ministry considers them. For owners of existing facilities, the next step is a formal application with supporting details: the site’s ownership status, a report on its current condition, the proposed work and an estimated cost. The ministry also assesses local need, the people using the facility, site suitability and who can manage and maintain it after completion. That maintenance test matters for community courts and grounds: the assessment is not just about paying for construction, but whether the facility can remain usable afterwards. It is the owning agency that must submit the application; the reply does not announce a cash-grant application for individual residents. Larger development proposals require state-level coordination and prioritisation before going through the Youth and Sports Ministry to the Economy Ministry. The parliamentary answer sets out that route, rather than a final list of Sarawak sites or a construction start date.
  • 0 Votes
    1 Posts
    10 Views
    K
    Sarawak now has a Platinum-rated product under Malaysia Tourism Quality Assurance, with Borneo Empurau Farm & Resort becoming the state’s first recipient of the programme’s highest tier. DayakDaily’s Oct 22 report puts the result in a wider picture: 116 tourism products nationwide have MyTQA recognition, including 10 in Sarawak. Thirty across Malaysia have attained Platinum. Those figures describe recognised tourism products—not the total number of resorts or attractions operating in the state. Two other Sarawak recipients were Lambir Hills National Park and Loagan Bunut National Park in Miri. Both received Silver recognition following reassessment and are managed by the Sarawak Forestry Corporation. Their recognition is a separate result from the resort’s Platinum award. MyTQA is run by the federal Ministry of Tourism, Arts and Culture. It has Silver, Gold and Platinum tiers, with assessments covering product quality, facilities and service standards. That gives visitors a clearer basis for understanding what the label refers to, rather than reading Platinum as a description of every service or attraction in Sarawak. The recognition ceremony took place on Oct 22. Operators were urged to keep improving their standards after receiving an award, making continued service quality—not just the presentation ceremony—the longer-term test.
  • 0 Votes
    1 Posts
    10 Views
    K
    A completed feasibility study for the proposed New Kuching International Airport is part of the backdrop to fresh transport discussions between Sarawak and the Netherlands—not an announcement that airport construction has begun. DayakDaily reported on Oct 22 that Netherlands Airport Consultants, or NACO, completed the study in the first quarter of 2026. The report places that earlier work alongside talks on aviation, airport development and green hydrogen during a Dutch ambassadorial visit to the Sarawak Ministry for Transport. Sarawak is interested in experience from Amsterdam’s Schiphol Airport and its surrounding aerotropolis, where airport activity connects with wider business development. The Netherlands also outlined a three-year industry cooperation programme involving companies and relevant agencies, aimed at technical exchanges, business participation and investment opportunities. For Kuching, the other link is the Kuching Urban Transportation System. The discussion included its hydrogen-powered Autonomous Rapid Transit vehicles and supporting hydrogen feeder buses, alongside sustainable public transport, ports and emerging transport technology. These are cooperation discussions. A feasibility study, an industry programme and a construction award are different stages; the reported visit does not announce a new airport opening date or a newly awarded building contract. The practical outcome to follow is which of these exchanges leads to a defined project or agreement.
  • 0 Votes
    1 Posts
    11 Views
    K
    A recreational park near Timberland Medical Centre is earmarked for a dry detention pond, giving stormwater somewhere to collect before it reaches nearby homes. The planned pond would cover about 5,000 square metres and be about 10 feet deep. It forms part of the RM100.2 million Sungai Maong Kiri Flood Mitigation Project, now at site mobilisation stage, DayakDaily reported on Oct 22. Unlike a permanent lake, a dry pond is intended to stay dry for much of the time. During heavy rain it temporarily holds excess runoff, then releases the water when conditions allow. That storage function is separate from simply making drains bigger. The wider project includes drain upgrades, river improvements and riverbank protection. A covered reinforced-concrete drain near the medical centre is intended to carry water towards the river. The reported corridor runs from Jalan Stampin Tengah through the Hui Sing and Timberland areas, Iris Garden and The Podium towards Sungai Maong and Stapok. The target completion date is March 14, 2029, following a 30-month construction period. Existing utilities and ageing water pipes complicate work in this built-up area; mobilisation does not mean the flood protection is already operating. Recreational use of the pond area when dry is a later possibility. The authorities plan to engage the community after completion; landscaping and a jogging track were examples discussed, not facilities residents can use now.
  • 0 Votes
    1 Posts
    21 Views
    K
    Heritage assessment should come before major development decisions in Sarawak, rather than after plans have already been settled, Deputy Minister Len Talif Salleh said at a Kuching gathering on Oct 21. His call places the focus on when a site is assessed, not simply whether its buildings or landscape are discussed later. The assessment he described would identify a site’s heritage value, its significance to the community and the likely effect of a proposed development. DayakDaily reported his remarks from the Sarawak Public Communication Unit. He was speaking at the ICOMOS gathering at the Borneo Convention Centre Kuching. Len Talif, the deputy minister responsible for urban planning, land administration and environment, also called for closer work between heritage bodies, planners, environmental institutions, councils, researchers and community leaders. For owners and communities facing future proposals, the distinction is between considering heritage while choices remain open and trying to protect it only after key decisions. These remarks set out a planning approach; the reported speech did not announce a new statutory approval rule or a specific project restriction.
  • 0 Votes
    1 Posts
    13 Views
    K
    Sarawak state civil servants are to receive two months of basic salary before the end of 2026, while federal officers serving in the state will get a separate RM700 payment in the first quarter of 2027. The different payment windows are central to the Oct 21 announcement: the RM700 for federal staff is not scheduled alongside the state-service payment this year. Premier Abang Johari Tun Openg announced the Special Financial Assistance during his winding-up speech at the Sarawak Legislative Assembly, DayakDaily reported. The state payment will be calculated using the last basic salary for November 2026. It is expected to cover about 19,851 employees and cost RM144 million. For federal personnel serving in Sarawak, the one-off RM700 assistance is expected to reach about 132,347 people, including teachers, healthcare workers and security personnel, with an estimated allocation of RM93 million. For households in Kuching and elsewhere in Sarawak, these are two different entitlements and calendars: a salary-based amount for state staff, and a fixed amount for federal staff. The announcement gives broad payment periods, not an exact bank-credit date.
  • 0 Votes
    1 Posts
    12 Views
    K
    Sarawak could get more dedicated air-quality monitoring stations under a federal effort to improve coverage, especially during transboundary haze. Natural Resources and Environmental Sustainability Minister Arthur Joseph Kurup told the Dewan Rakyat on Oct 22 that areas without their own stations currently rely on regional data from the nearest station. For communities outside the existing network, that distinction matters: a nearby reading gives a regional picture, rather than a measurement taken in their own neighbourhood. TVS reported that the Department of Environment has 68 monitoring stations nationwide. That is the Malaysian total, not the number in Sarawak. The minister did not give a number, location list or installation timetable for additional Sarawak stations in the reported reply. He also said MetMalaysia had developed MyCMAQ, an air-quality modelling platform able to forecast potential pollution and haze up to five days ahead across Malaysia and Southeast Asia. The two tools serve different purposes: station readings describe monitored conditions, while MyCMAQ provides an advance indication of what may develop. A five-day forecast is not a guarantee that haze will occur at a particular Kuching address.
  • 0 Votes
    1 Posts
    21 Views
    K
    Sarawak has provided RM30,000 to train people with disabilities in four skills categories as they seek places at the 2027 International Abilympics in Finland. The grant goes through the Social Welfare Department to the Sarawak OKU Skills Development Association, known as Sosda. It supports training rather than confirming that everyone in the programme has secured a place on Malaysia’s team. The Borneo Post reported that training covers floral arrangement, poster design, reflexology and photography. Pretty Petals is involved in floral arrangement, GiatMara Stampin in poster design and Centexs Santubong in photography, giving the programme a direct link to skills providers in the Kuching area. Women, Childhood and Community Wellbeing Development Minister Fatimah Abdullah described the support at a press conference at the Sarawak Legislative Assembly Complex on Oct 21. The emphasis was on skills that can also support employment and independent income, not only competition results. The association reported that one Sarawak participant had qualified in floral arrangement, while it was working to help others qualify. Training across four categories therefore should not be mistaken for four confirmed national-team entries.
  • 0 Votes
    1 Posts
    16 Views
    K
    Lawas town’s RM29.5 million Type 3 health clinic is expected to begin operating in early 2027, while the separate RM8.21 million replacement clinic at Kuala Lawas has a January 2028 completion target. The two schedules describe different facilities. The Lawas clinic is expected to be handed over by Sarawak’s Public Works Department to the Health Ministry this December; a handover target is not the same as an opening date. Deputy Health Minister Hanifah Hajar Taib outlined the projects in a Dewan Rakyat reply on Oct 21, The Borneo Post reported. The planned additional services at the Lawas facility include radiology, dental care, rehabilitation, physiotherapy and occupational therapy, alongside four staff quarters. Kuala Lawas is replacing existing clinic infrastructure. Construction began in July 2026, with an 18-month programme and expected completion in January 2028. Its stated facilities include an emergency room, three treatment rooms and four staff quarters. For families following healthcare access in the district, the immediate milestone is the planned December handover at Lawas, followed by the proposed start of services early next year. Neither that timetable nor Kuala Lawas’s later construction target should be read as confirmation that the new facilities are already open.
  • 0 Votes
    1 Posts
    17 Views
    K
    Kuching recorded an Air Pollutant Index of 65 at 8am on Oct 22, within the moderate band. None of the 21 Sarawak locations in the morning update was in the unhealthy category. The Borneo Post’s report of the Natural Resources and Environment Board readings put nearby Samarahan at 71, Serian and Tebedu at 68, and Lundu at 65. These are readings for Thursday morning, not a forecast for the rest of the day. Only three locations were in the good band: Lawas at 29, Bario at 33 and Limbang at 35. The other 18 were moderate, with Betong recording the highest figure at 84, followed by Sri Aman at 83. For Kuching readers, the distinction is that local air was moderate, not good, even though all stations were below the unhealthy band. The stated classifications put readings of 0–50 in the good category and 51–100 in moderate. The 8am snapshot gives a dated reference for comparing later updates; it does not establish that haze has ended or that conditions will remain unchanged.
  • 0 Votes
    1 Posts
    20 Views
    K
    Retired Sarawak State civil servants are to receive a one-off RM500 payment, with about 10,141 retirees expected to benefit. A separate RM700 incentive has been announced for private media practitioners registered with six media associations in Sarawak. Premier Datuk Patinggi Tan Sri Abang Johari Tun Openg announced both measures in his Oct 21 winding-up speech at the Sarawak Legislative Assembly. The retirees’ assistance is estimated to cost RM5.1 million and recognises their years of State service. The media incentive is RM700 per person, but the announced scope is not everyone working in communications or publishing: it refers specifically to private media practitioners registered with the six associations. The report does not name those associations or set out an application procedure. Neither measure came with a stated payment date in this announcement. For prospective recipients, the confirmed details are the one-off amounts and the groups covered, rather than an immediate credit or a newly opened application window.
  • 0 Votes
    1 Posts
    14 Views
    K
    Sarawak Energy’s electric boat is headed for operational work at the Batang Ai reservoir, including dam safety inspections, environmental monitoring and transporting personnel. Transport Minister Dato Sri Lee Kim Shin attended the Oct 21 handover of the Boat Licence and River Transport Permit at Pangkalan Sapi. The solar-supplemented vessel will also support visits to the floating solar farm, according to the announcement reported by DayakDaily. The 10-metre fibreglass boat has twin 40 kW electric outboard motors, a 92 kWh battery and 3.6 kWp of rooftop solar panels. Its reported operating estimates are 40–50 kilometres of range and roughly three to four hours of use, with a maximum speed of 25 km/h. Registered passenger capacity is 12. These are vessel specifications and estimates, not a published passenger-service timetable. Lee said range, charging facilities, river conditions, safety and cost-effectiveness would need evaluation before wider adoption. Batang Ai will provide experience with operational reliability, charging and maintenance. The immediate development is a licensed boat for reservoir duties; other electric-vessel applications across Sarawak remain under study.
  • 0 Votes
    1 Posts
    14 Views
    K
    Sarawak has completed 39 of the 135 minor bridges in a RM400 million upgrading and replacement programme, while most of the remaining bridges have yet to reach construction. Deputy Premier and Minister for Infrastructure and Port Development Datuk Amar Douglas Uggah Embas outlined the position at the Sarawak Legislative Assembly on Oct 21. Another 31 bridges are under construction, 17 are at tender stage and 48 are at the pre-contract stage. The programme targets rural connections, particularly minor bridges along former logging and timber roads. Its scope is upgrading or replacing those crossings, rather than a single new highway or one large river bridge. The figures account for all 135 bridges: 39 completed and 96 in the remaining stages. Of those 96, 65 are still at tender or pre-contract stage. That distinction matters for communities waiting for better access: a bridge in the programme is not necessarily already being built. The update does not provide individual crossing locations or a completion date for each of the remaining bridges.
  • 0 Votes
    1 Posts
    14 Views
    K
    A further RM253 million under Sumbangan Keperluan Asas Sarawak (SKAS) is scheduled for disbursement in November, following RM427 million that had benefited more than 823,000 recipients as of September. Deputy Premier Datuk Amar Douglas Uggah Embas gave the update in his Oct 21 winding-up speech at the Sarawak Legislative Assembly. He said RM680 million had been approved for the scheme, which helps eligible households purchase essential goods. The RM253 million is the remaining balance of that approved programme funding. Together with the RM427 million already reported, it accounts for the RM680 million total; it is not an additional RM253 million on top of that ceiling. For recipients, November is the announced disbursement month, not confirmation that every account has already been credited. This update does not specify an individual payment date or a new per-recipient amount. The September recipient figure is also a measure of assistance already delivered, not a newly announced intake.
  • 0 Votes
    1 Posts
    14 Views
    K
    A locally developed seedball machine gives Sarawak another tool for restoring forests in hard-to-reach areas, with a stated capacity of up to 3,000 seedballs a day. The machine was developed through a collaboration between the Sarawak Forest Department and the University of Technology Sarawak, according to DayakDaily’s Oct 21 report of Deputy Premier Datuk Amar Awang Tengah’s legislative assembly winding-up speech. The capacity figure describes how many seedballs the machine can produce. It is not a count of trees planted or surviving, and the report does not give a germination rate, restored area or deployment schedule. For forest rehabilitation, those outcomes remain separate from the speed at which material can be prepared. Awang Tengah presented the machine as an additional practical option for restoration programmes, particularly where access is difficult. The update concerns work by the department and university; it does not announce distribution of machines or seedballs to the public. The local significance lies in applying university and forestry expertise to an operational problem. The next useful measure is how the equipment contributes to restoration on the ground, rather than treating its maximum daily output as a finished forest.
  • 0 Votes
    1 Posts
    16 Views
    K
    Sarawak’s affordable-housing update sets a 1,410-unit target under the 13th Malaysia Plan, but the nearer completion milestone concerns 402 homes already under construction. Those 402 units are expected to be completed in the second quarter of 2027. Of that group, 157 are to receive solar-energy systems, with the State government bearing half the installation cost, according to the Oct 21 DayakDaily report of the legislative assembly winding-up speech. Second Minister for Natural Resources and Urban Development Datuk Amar Awang Tengah said the Land Custody and Development Authority’s broader 1,410-unit programme carried an estimated construction cost of RM524.9 million. Budget 2027 approved RM213.35 million for the projects. The total estimate and that budget allocation are different figures, not two additional housing programmes. He put the cost of providing a home under the Village Expansion Scheme and Resettlement Scheme at RM350,000 to RM435,000, against a selling price of RM150,000. A land premium of RM2,500 per lot was also cited. Solar installation for the 157 homes was valued at RM4.553 million in total; the 50 per cent State contribution refers to installation, not half the purchase price of a house. For prospective buyers, this is a programme-and-construction update rather than an announcement that all 1,410 homes are ready. It does not set out individual project locations, application dates or eligibility requirements.
  • 0 Votes
    1 Posts
    16 Views
    K
    Businesses and road users along Jalan Padungan and Jalan Chan Chin Ann face temporary construction disruption as MBKS upgrades drainage in the flood-prone commercial area. The RM1.45 million project is expected to run until June 2027. Kuching South mayor Datuk Wee Hong Seng handed the site to contractor Liscorp Services on Oct 20, according to DayakDaily’s Oct 21 report. About 200 metres of additional reinforced-concrete box drains, each 1.2 metres wide and 1.2 metres deep, are planned to improve stormwater flow through the existing network. The work also covers affected utility services and reinstatement of roads and footpaths. For people visiting or operating shops in the area, the immediate issue is access during construction. MBKS warned of possible traffic diversions, access restrictions, noise and dust, and said the public would be informed about work and necessary traffic arrangements. These are potential disruptions over the construction period, not a blanket road-closure announcement. The council also cautioned that better drains will not eliminate flooding altogether. Rainfall intensity, tides, river levels and upstream discharge can still affect conditions. June 2027 is the expected construction endpoint; it is not a promise that Padungan will become flood-free.