Skip to content
  • 0 Votes
    1 Posts
    17 Views
    K
    A temporary drainage fix is coming to the KUTS project site along Jalan Tun Jugah after nearby residents raised flash-flood concerns. [image: 1785146712862-kuts_tun_jugah_20260727.jpg] The Kuching Urban Transportation System (KUTS) project engineer and contractor have agreed to widen the drainage outlet along Jalan Tun Jugah as an interim measure. Kota Sentosa assemblyman Wilfred Yap said the issue came from residents around Jalan Durian Burung, near the Federal Staff Quarters. They were worried that an existing roadside open drain had been buried and replaced with metal pipes that were too small, possibly worsening flash floods in an area already known to flood. Yap said the contractor agreed to further widen the outlet while waiting for the Tunnel Boring Machine (TBM), which is expected to arrive in early August. Once TBM works begin, the underground crossing below Jalan Tun Jugah is expected to be completed by October, allowing a more permanent drainage solution after that. Location: Jalan Tun Jugah, Kuching Details: Residents had asked for larger temporary culverts and proper drainage while waiting for the long-term flood mitigation works. Yap said he will continue monitoring the agreed improvements. Photo credit: DayakDaily Source: DayakDaily What do you think?
  • 0 Votes
    1 Posts
    11 Views
    K
    Kuching's RM2.6 billion flood mitigation project is back in the spotlight, after a call for MBKS to use its RM300 million reserves. Kuching South Mayor Dato Wee Hong Seng questioned whether that reserve fund could realistically cover a project of that size. [image: 1785125110348-mbks_flood_reserve-resized.jpg] Source: The Borneo Post What happened Wee said MBKS has about RM300 million in reserves, while the wider flood mitigation project for Kuching is estimated at RM2.6 billion. His point was simple: even if the council used the reserve, it would still be far short of the amount needed. He also said Deputy Prime Minister Datuk Amar Fadillah Yusof had already announced that major flood mitigation projects in Sarawak would start progressively from 2027. Why people are talking The issue came after Michael Kong, special assistant to Sarawak DAP chairman, urged MBKS to review its priorities and consider using part of its reserves for drainage and flood mitigation works. Kong argued that financial prudence should not become an excuse for inaction when long-standing infrastructure problems are affecting residents. Wee pushed back, saying large-scale flood mitigation falls under federal responsibility and should not be turned into another political issue. Location: Kuching South / MBKS area Details: RM2.6 billion flood mitigation project; RM300 million MBKS reserve fund; federal rollout expected from 2027 Source: The Borneo Post For Kuching residents who deal with flash floods, the big question is whether the money and timeline can match the actual problem on the ground. What do you think?