Skip to content
  • 0 Votes
    1 Posts
    12 Views
    K
    A RM550 million smart-city project will cover Greater Kuching, while a separate RM545 million Jendela rollout targets connectivity gaps elsewhere across Sarawak. The two allocations are not the same pot of money. The Kuching Smart City and Digital Connectivity project initially covers Kuching North, Kuching South, Padawan and Kota Samarahan council areas. Its planned systems include public Wi-Fi, a shared city platform, traffic-management tools and support for emergency response. Data and artificial intelligence are part of the design, alongside cybersecurity and data protection. An agreement for the Kuching project was signed at the Sarawak Legislative Assembly complex on October 15. That is the signing venue; the intended service area is Greater Kuching, not just the assembly precinct. For residents, the distinction is practical: the city programme concerns urban services as well as digital infrastructure. The first phase of Jendela Phase 2, announced separately, is intended to improve internet access at nearly 350 locations across the state, through six project clusters. Letters of acceptance have been handed to the appointed companies, with equipment expected to reach tower sites in the coming months. Neither announcement means new Wi-Fi or improved mobile coverage is already available at a particular address. Local installation details and service activation are the milestones to look for before changing an internet plan.
  • 0 Votes
    1 Posts
    28 Views
    K
    Sarawak’s utility and telecommunications ministry has asked the Malaysian Communications and Multimedia Commission for additional spectrum, saying the extra capacity could help ease network congestion when usage rises. The request has not been announced as approved. The ministry also said a Sept 28 discussion with MCMC and Sarawak agencies covered damaged or stolen fibre lines, maintenance of leaning towers and low-hanging cables, and closer cooperation between service providers. It raised shared Multi-Operator Core Network technology as one possible way for operators to improve coverage for customers. For users, the immediate development is a request and a set of infrastructure issues under discussion—not a confirmed change to mobile coverage or service quality.
  • 0 Votes
    1 Posts
    42 Views
    K
    Long Banga and Ba’kelalan STOLports will share RM30 million in federal funding for upgrades targeted to start this year. Each rural airstrip has been allocated RM15 million from the Airport Development Fund. The money is approved, but design work and other preparations must be completed before construction can begin. The plans cover terminal improvements and possible runway extensions, depending on the physical conditions at each site. The current runway limits Twin Otter flights to nine passengers; a longer runway could raise that capacity, although the final scope is still being worked out. For communities in Sarawak’s northern interior, the two air links support access to schools, healthcare, supplies and town services across difficult terrain. The next concrete milestones are the design work, the construction schedule and a decision on whether either runway can be extended. Location: Long Banga and Ba’kelalan, Sarawak
  • 0 Votes
    1 Posts
    31 Views
    K
    Northern Sarawak’s connectivity plan is moving toward a direct Limbang–Lawas link, with the new route intended to reduce reliance on paths through Brunei. The agreement signed in Lawas on Aug 26 brings Sarawak Digital Economy Corporation (SDEC) and Syarikat SESCO Berhad (SESCO) together to use communications infrastructure already owned in Sarawak. It includes SESCO’s Virtual Fibre network, with the overall network alignment reported at about 1,926 kilometres. The gap is felt in everyday services. Businesses in Lawas have faced e-payment problems, while the Lawas district police headquarters has also experienced internet issues despite its role in disaster management. Better links would support education, healthcare, government services and emergency response across the two northern divisions. This is an infrastructure agreement, not a switch-on notice. The parties have not given a launch date, coverage map or speed target, so the next meaningful update will be where the route reaches and whether service interruptions ease.
  • 0 Votes
    1 Posts
    48 Views
    K
    BCCK now has Sarawak's first live indoor 5G coverage, aimed at keeping large events online without the usual crowd-network slowdown. [image: 1784109896030-bcck-5g.jpeg] Source: DayakDaily / UKAS Borneo Convention Centre Kuching (BCCK) has upgraded its digital infrastructure with an in-building 5G coverage system at BCCK 1. The system covers more than 3,740 square metres and is meant to support high-density use during conferences, exhibitions and major gatherings. Location: Borneo Convention Centre Kuching (BCCK) Details: Sarawak Minister of Utility and Telecommunication Dato Sri Julaihi Narawi said 5G speeds can reach more than 1,100Mbps, compared with about 200Mbps on 4G. The upgrade is also seen as a base for future connectivity at BCCK 2 once the expansion is ready. For visitors, exhibitors and event crews, this should mean smoother digital registration, livestreaming and online services when the hall is packed. Source: DayakDaily What do you think?