Sarawak is being urged to publish regular water-level data for the Bakun and Murum hydroelectric reservoirs.
Sarawak is being urged to publish regular water-level data for the Bakun and Murum hydroelectric reservoirs as prolonged dry weather raises questions about future power generation.
Senator Abun Sui Anyit said he saw what appeared to be a 300m to 500m exposed stretch along the Bakun reservoir during a visit on June 2. He stressed that this was a field observation, not an official measurement.
He wants Sarawak Energy Berhad and the state government to release the current levels, minimum operating levels and a clear contingency plan. He also called for independent studies on the impact of drought, climate change and sedimentation.
Sarawak Energy's published figures put Bakun's maximum operating level is EL 228m and its minimum operating level is EL 195m.
This update concerns planning, repairs or public data—not an automatic notice that the facility has closed or that a power or water disruption is imminent. The next useful confirmation is the agency's approval, tender, works timetable or published measurement.
[image: 1787015299226-bakun-dam-reservoir.jpg]
Source: The Borneo Post