Skip to content
  • 0 Votes
    1 Posts
    10 Views
    K
    从 CityOne 红绿灯路口通往 Jalan Laksamana Cheng Ho 的一段 Jalan Tun Jugah,预定从2026年7月29日至12月31日局部封路,以进行 KUTS 工程。 [image: 1785384236632-tun_jugah_cityone_20260730.jpg] 图片: Sarawak Metro,经 DayakDaily Sarawak Metro 表示,这项临时交通改道是配合古晋城市交通系统工程。通告说的是局部封路,并不是整条 Jalan Tun Jugah 完全关闭。 驾驶者应该怎样安排 工程推进时,交通路线可能调整,因此现场地图、路牌和人员指示应优先于旧的社交媒体截图。进入工程区前先减速,遵守临时车道箭头与限速,不要到最后一刻才突然换线。 CityOne、Jalan Laksamana Cheng Ho 及附近商家仍可抵达,不过平日高峰、上下学时段和大型活动期间,行程时间可能较难预测。有重要预约的话,最好预留额外时间,出发前也可先看替代路线。 Sarawak Metro 表示,施工时间或交通安排若有变化会继续通知。民众可在星期一至五上午8时至下午5时(公共假期除外)拨打 KUTS 热线 1300-88-5887,或电邮 [email protected][email protected] 查询。 这篇文章适用于已公布的7月29日至12月31日工程期。过了日期后,应查看最新通告,不要直接假设改道仍然生效。 受影响方向: CityOne 路口往 Jalan Laksamana Cheng Ho 状态: 局部封路 / 临时改道 资料来源: DayakDaily · Sarawak Metro
  • 0 Votes
    1 Posts
    9 Views
    K
    A section of Jalan Tun Jugah from the CityOne traffic-light junction towards Jalan Laksamana Cheng Ho is scheduled for partial closure from July 29 to Dec 31, 2026 for KUTS construction. [image: 1785384236632-tun_jugah_cityone_20260730.jpg] Image: Sarawak Metro via DayakDaily Sarawak Metro said the temporary diversion is needed for work under the Kuching Urban Transportation System. The notice covers a partial closure, not a complete shutdown of Jalan Tun Jugah. What drivers should plan for Traffic arrangements can change as work moves, so the map and signs on site take priority over an old social-media screenshot. Drivers should reduce speed before the work zone, follow lane arrows and temporary limits, and avoid changing lanes at the last moment. CityOne, Jalan Laksamana Cheng Ho and surrounding businesses remain reachable, but travel time may be less predictable during weekday peak hours, school traffic and major events. If an appointment matters, allow an extra buffer or check an alternative route before leaving. Sarawak Metro said it would announce changes to the schedule or traffic plan. Enquiries can be made through the KUTS hotline at 1300-88-5887, Monday to Friday from 8am to 5pm excluding public holidays, or by email at [email protected] and [email protected]. This post is valid for the announced July 29–Dec 31 construction period. After that date, verify the latest notice instead of assuming the diversion remains in place. Affected direction: CityOne junction towards Jalan Laksamana Cheng Ho Status: Partial closure / temporary traffic diversion Sources: DayakDaily · Sarawak Metro