Skip to content
  • Categories
  • Recent
  • Tags
  • Popular
  • World
  • Users
  • Groups
Collapse
KuchingHub - Kuching Community Forum / KuchingHub 古晋社区论坛
  1. KuchingHub - Kuching Community Forum
  2. English
  3. News 📰
  4. Miri drainage allocation separates new tender projects from completed maintenance

Miri drainage allocation separates new tender projects from completed maintenance

Scheduled Pinned Locked Moved News 📰
sarawakmiri-newsdrainage
1 Posts 1 Posters 13 Views 1 Watching
  • Oldest to Newest
  • Newest to Oldest
  • Most Votes
Reply
  • Reply as topic
Log in to reply
This topic has been deleted. Only users with topic management privileges can see it.
  • K Offline
    K Offline
    kuchinghub
    wrote last edited by
    #1

    A RM3 million allocation for flood-prone parts of Miri includes two major drainage projects that still need to go through tender before work starts.

    The funding will go through Miri City Council (MBM), with Desa Senadin, Permyjaya, Tudan and parts of Padang Kerbau named in the announcement. DayakDaily reported the details on Oct 30, citing the Sarawak Public Communication Unit (Ukas) and the caretaker transport minister.

    The planned packages include a RM1.17 million monsoon-drain upgrade along Jalan Desa Senadin, with a three-month implementation period, and RM1.26 million for maintaining and deepening earth drains along Jalan Miri–Kuala Baram over two months. Their technical designs are ready, but tendering comes before implementation.

    A further RM562,390 package covers maintenance, dredging and clearing at residential drainage locations around Senadin, with a one-month implementation period. Those durations describe the work packages; they are not announced calendar completion dates.

    Residents should also distinguish this allocation from work already finished. The Department of Irrigation and Drainage has separately completed 18 maintenance projects worth RM1.17 million, covering six retention ponds and 12 main drains. That identical RM1.17 million figure is not the new Jalan Desa Senadin contract.

    Larger drainage proposals for Desa Senadin, Sungai Lutong and the Taman Tunku–Padang Kerbau stretch remain subject to utility issues and approvals. The new allocation is intended to reduce flood risk, not a declaration that those wider problems have been resolved.

    1 Reply Last reply
    0

    Hello! It looks like you're interested in this conversation, but you don't have an account yet.

    Getting fed up of having to scroll through the same posts each visit? When you register for an account, you'll always come back to exactly where you were before, and choose to be notified of new replies (either via email, or push notification). You'll also be able to save bookmarks and upvote posts to show your appreciation to other community members.

    With your input, this post could be even better 💗

    Register Login
    Reply
    • Reply as topic
    Log in to reply
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes


    About / 关于我们Contact / 联系我们Privacy / 隐私政策Terms / 社区守则Editorial / 编辑与更正
    © 2026 KuchingHub · Independent Kuching community forum / 独立古晋社区论坛
    • Login

    • Don't have an account? Register

    • Login or register to search.
    Powered by NodeBB Contributors
    • First post
      Last post
    0
    • Categories
    • Recent
    • Tags
    • Popular
    • World
    • Users
    • Groups