<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0"><channel><title><![CDATA[Glass bridge, 3km scenic riverfront walkway planned for Batu Kawa]]></title><description><![CDATA[<p dir="auto"><strong>A glass bridge and 3km scenic riverside walkway are coming to Batu Kawa, connecting Kampung Rantau Panjang to Batu Kawa Riverbank Park.</strong></p>
<p dir="auto">Deputy Premier Datuk Amar Dr Sim Kui Hian announced the plan after visiting the site on June 22 with the Department of Irrigation and Drainage (DID) Sarawak team.</p>
<p dir="auto">The proposed walkway will link the predominantly Malay riverside villages with the historic Batu Kawa Chinese old town, creating a continuous promenade along the river.</p>
<h2>Riverbank Protection</h2>
<p dir="auto">The project includes Phase 2 riverbank protection works covering 500 metres (split into 350m and 150m sections). DID will first carry out a temporary RM200,000 solution while designs for the permanent structure are completed. Open tender is expected by end of this year.</p>
<h2>Cost &amp; History</h2>
<p dir="auto">The first phase (450 metres) was initially awarded in 2019 for RM8.7 million but became a sick project during Covid when material costs surged. It was retendered in 2022 at RM11.6 million and completed in late 2023.</p>
<p dir="auto">Dr Sim said the Premier has allocated a RM31 million ceiling for the remaining 500 metres of riverbank works scheduled for 2026.</p>
<p dir="auto"><img src="https://kuchinghub.com/assets/uploads/files/1782194603298-batu-kawa-glass-bridge-1.jpg" alt="" class=" img-fluid img-markdown" /></p>
<blockquote>
<p dir="auto">Dr Sim (in yellow shirt) reviewing the riverbank protection plan with DID Sarawak team during a site visit on June 22, 2026.</p>
</blockquote>
<p dir="auto"><img src="https://kuchinghub.com/assets/uploads/files/1782194603385-batu-kawa-glass-bridge-2.jpg" alt="" class=" img-fluid img-markdown" /></p>
<blockquote>
<p dir="auto">The proposed second phase of riverbank protection works at Kampung Rantau Panjang in Batu Kawa.</p>
</blockquote>
<h2>Rising Construction Costs</h2>
<p dir="auto">Dr Sim noted the entire 950-metre project would have cost RM18.6 million if done as a single project in 2019. The remaining 500 metres alone is now projected at RM31 million — a reflection of escalating material prices and global uncertainties.</p>
<p dir="auto"><img src="https://kuchinghub.com/assets/plugins/nodebb-plugin-emoji/emoji/android/1f4cd.png?v=70de5f145f9" class="not-responsive emoji emoji-android emoji--round_pushpin" style="height:23px;width:auto;vertical-align:middle" title="📍" alt="📍" /> <strong>Location:</strong> Kampung Rantau Panjang, Batu Kawa, Kuching<br />
<img src="https://kuchinghub.com/assets/plugins/nodebb-plugin-emoji/emoji/android/1f4f0.png?v=70de5f145f9" class="not-responsive emoji emoji-android emoji--newspaper" style="height:23px;width:auto;vertical-align:middle" title="📰" alt="📰" /> <strong>Details:</strong> 3km scenic walkway + glass bridge connecting Malay villages to Batu Kawa town</p>
<p dir="auto"><img src="https://kuchinghub.com/assets/plugins/nodebb-plugin-emoji/emoji/android/1f517.png?v=70de5f145f9" class="not-responsive emoji emoji-android emoji--link" style="height:23px;width:auto;vertical-align:middle" title="🔗" alt="🔗" /> <strong>Source:</strong> <a href="https://dayakdaily.com/glass-bridge-riverbank-works-to-transform-kpg-rantau-panjang-batu-kawa-riverfront-into-3km-scenic-walkway/" rel="nofollow ugc">DayakDaily</a></p>
<p dir="auto">What do you think of this development? <img src="https://kuchinghub.com/assets/plugins/nodebb-plugin-emoji/emoji/android/1f447.png?v=70de5f145f9" class="not-responsive emoji emoji-android emoji--point_down" style="height:23px;width:auto;vertical-align:middle" title="👇" alt="👇" /></p>
]]></description><link>https://kuchinghub.com/topic/220/glass-bridge-3km-scenic-riverfront-walkway-planned-for-batu-kawa</link><generator>RSS for Node</generator><lastBuildDate>Sun, 12 Jul 2026 17:15:05 GMT</lastBuildDate><atom:link href="https://kuchinghub.com/topic/220.rss" rel="self" type="application/rss+xml"/><pubDate>Tue, 23 Jun 2026 06:03:23 GMT</pubDate><ttl>60</ttl></channel></rss>