<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0"><channel><title><![CDATA[Batang Ai electric boat licensed for reservoir operations and monitoring]]></title><description><![CDATA[<p dir="auto"><strong>Sarawak Energy’s electric boat is headed for operational work at the Batang Ai reservoir, including dam safety inspections, environmental monitoring and transporting personnel.</strong></p>
<p dir="auto">Transport Minister Dato Sri Lee Kim Shin attended the Oct 21 handover of the Boat Licence and River Transport Permit at Pangkalan Sapi. The solar-supplemented vessel will also support visits to the floating solar farm, according to the announcement reported by DayakDaily.</p>
<p dir="auto">The 10-metre fibreglass boat has twin 40 kW electric outboard motors, a 92 kWh battery and 3.6 kWp of rooftop solar panels. Its reported operating estimates are 40–50 kilometres of range and roughly three to four hours of use, with a maximum speed of 25 km/h. Registered passenger capacity is 12. These are vessel specifications and estimates, not a published passenger-service timetable.</p>
<p dir="auto">Lee said range, charging facilities, river conditions, safety and cost-effectiveness would need evaluation before wider adoption. Batang Ai will provide experience with operational reliability, charging and maintenance. The immediate development is a licensed boat for reservoir duties; other electric-vessel applications across Sarawak remain under study.</p>
]]></description><link>https://kuchinghub.com/topic/2100/batang-ai-electric-boat-licensed-for-reservoir-operations-and-monitoring</link><generator>RSS for Node</generator><lastBuildDate>Wed, 28 Oct 2026 14:32:12 GMT</lastBuildDate><atom:link href="https://kuchinghub.com/topic/2100.rss" rel="self" type="application/rss+xml"/><pubDate>Wed, 21 Oct 2026 11:07:57 GMT</pubDate><ttl>60</ttl></channel></rss>