<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0"><channel><title><![CDATA[Lebuh Java to get RM1.5 million Festival Square in Kuching]]></title><description><![CDATA[<p dir="auto">A planned RM1.5 million Festival Square at Lebuh Java would add 1,230 square metres of public space beside Kuching's waterfront, with seating, traditional games and facilities for different age groups.</p>
<p dir="auto">DBKU will undertake the project with PETRONAS Sarawak as its strategic partner. The plans were outlined at an October 8 press conference at Lebuh Java, with construction expected to take eight months and work expected to begin soon. <strong>That is a construction estimate, not an announced opening date.</strong></p>
<p dir="auto">The square is intended to give residents a dedicated place for major celebrations while complementing the existing Kuching Waterfront. Planned features include a smart toilet, greywater recycling, solar power and a cat landmark. These remain features of the proposed development, not facilities already available for visitors.</p>
<p dir="auto">For people who use the waterfront, the practical change would be an additional shared space rather than a replacement for the existing promenade. A firm start date, opening date and arrangements around the work site were not set out in the announcement.</p>
]]></description><link>https://kuchinghub.com/topic/1806/lebuh-java-to-get-rm1.5-million-festival-square-in-kuching</link><generator>RSS for Node</generator><lastBuildDate>Wed, 28 Oct 2026 22:26:20 GMT</lastBuildDate><atom:link href="https://kuchinghub.com/topic/1806.rss" rel="self" type="application/rss+xml"/><pubDate>Thu, 08 Oct 2026 06:05:37 GMT</pubDate><ttl>60</ttl></channel></rss>