<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0"><channel><title><![CDATA[Mukah Basong expansion reaches 15.1%, targeting doubled treatment capacity]]></title><description><![CDATA[<p dir="auto"><strong>Mukah’s Basong Water Treatment Plant expansion is 15.1% complete, with completion targeted for September 2028.</strong></p>
<p dir="auto">The RM243.98 million Phase 3 project is designed to add a new plant producing 60 million litres a day, taking Basong’s total treatment capacity from 60 million to 120 million litres daily. It also includes an 18km raw-water pipeline with a diameter of 1,000mm.</p>
<p dir="auto">The October 2 progress update puts the state-funded project ahead of schedule. Construction began in September 2025; the additional capacity is still being built, rather than already supplying households.</p>
<p dir="auto">The expansion is intended to meet future residential and industrial demand in Mukah Division. Raw-water availability remains part of that planning, particularly during dry periods when intake conditions can affect treatment operations.</p>
<p dir="auto">Sarawak’s wider water-grid planning also includes a central-region system covering Mukah, Sarikei, Sibu and Kapit. Rural areas that cannot yet connect fully to the grid continue to be served through alternative water-supply arrangements.</p>
]]></description><link>https://kuchinghub.com/topic/1724/mukah-basong-expansion-reaches-15.1-targeting-doubled-treatment-capacity</link><generator>RSS for Node</generator><lastBuildDate>Wed, 28 Oct 2026 01:57:41 GMT</lastBuildDate><atom:link href="https://kuchinghub.com/topic/1724.rss" rel="self" type="application/rss+xml"/><pubDate>Sat, 03 Oct 2026 01:12:26 GMT</pubDate><ttl>60</ttl></channel></rss>