<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0"><channel><title><![CDATA[Sarawak&#x27;s First Road Tunnel at Bukit Pagon, Lawas — SSLR Phase 2 Hits 11.39% Progress]]></title><description><![CDATA[<p dir="auto"><strong>Sarawak is building its first-ever road tunnel — a 2.24km underground passage through Bukit Pagon in Lawas, cutting travel distance from 22.4km to just 7km.</strong></p>
<p dir="auto">The tunnel is part of the Sarawak–Sabah Link Road (SSLR) Phase 2, a 335.54km road alignment connecting Sarawak and Sabah. As of June 11, Phase 2 has reached 11.39% physical progress, with full completion targeted for 2029.</p>
<p dir="auto"><img src="https://kuchinghub.com/assets/plugins/nodebb-plugin-emoji/emoji/android/1f4cd.png?v=70de5f145f9" class="not-responsive emoji emoji-android emoji--round_pushpin" style="height:23px;width:auto;vertical-align:middle" title="📍" alt="📍" /> <strong>Location:</strong> Bukit Pagon, Bakun Range (Lawas–Limbang border)<br />
<img src="https://kuchinghub.com/assets/plugins/nodebb-plugin-emoji/emoji/android/1f4f0.png?v=70de5f145f9" class="not-responsive emoji emoji-android emoji--newspaper" style="height:23px;width:auto;vertical-align:middle" title="📰" alt="📰" /> <strong>Details:</strong></p>
<ul>
<li>2.24km tunnel under Package 4 of SSLR Phase 2</li>
<li>Cuts travel distance from 22.4km to 7km — saving over 15km</li>
<li>2% longitudinal gradient, 321m max overburden depth</li>
<li>Emergency widening sections every 500m for safety</li>
<li>Expected to significantly improve connectivity between Sarawak and Sabah</li>
</ul>
<p dir="auto">JKR Sarawak director Datu Dr Ir Cassidy Morris visited the tunnel site on June 11 to inspect progress.</p>
<p dir="auto">Meanwhile, SSLR Phase 1 has reached 71.16% completion and is on track for March 16, 2027. It features the MyArch Bridge, a modern arch bridge design that will serve as a landmark along the route.</p>
<p dir="auto">Phase 2 Package 3 (62.9km road built to JKR R3 standards) is also progressing at 16.25%, targeting completion by June 2029.</p>
<p dir="auto"><img src="https://kuchinghub.com/assets/uploads/files/1781244246800-tunnel-proposal-map.jpg" alt="" class=" img-fluid img-markdown" /><br />
<em>The proposed tunnel location at Bukit Pagon, Lawas</em></p>
<p dir="auto"><img src="https://kuchinghub.com/assets/uploads/files/1781244247304-myarch-bridge.jpg" alt="" class=" img-fluid img-markdown" /><br />
<em>MyArch Bridge — a landmark design feature of SSLR Phase 1</em></p>
<p dir="auto"><img src="https://kuchinghub.com/assets/plugins/nodebb-plugin-emoji/emoji/android/1f517.png?v=70de5f145f9" class="not-responsive emoji emoji-android emoji--link" style="height:23px;width:auto;vertical-align:middle" title="🔗" alt="🔗" /> <strong>Source:</strong> <a href="https://dayakdaily.com/sarawaks-first-road-tunnel-at-bukit-pagon-lawas-advances-as-sslr-phase-2-hits-11-39-pct/" rel="nofollow ugc">DayakDaily</a></p>
<p dir="auto">What do you think of Sarawak's first tunnel? <img src="https://kuchinghub.com/assets/plugins/nodebb-plugin-emoji/emoji/android/1f447.png?v=70de5f145f9" class="not-responsive emoji emoji-android emoji--point_down" style="height:23px;width:auto;vertical-align:middle" title="👇" alt="👇" /></p>
]]></description><link>https://kuchinghub.com/topic/145/sarawak-s-first-road-tunnel-at-bukit-pagon-lawas-sslr-phase-2-hits-11.39-progress</link><generator>RSS for Node</generator><lastBuildDate>Wed, 17 Jun 2026 15:09:45 GMT</lastBuildDate><atom:link href="https://kuchinghub.com/topic/145.rss" rel="self" type="application/rss+xml"/><pubDate>Fri, 12 Jun 2026 06:05:38 GMT</pubDate><ttl>60</ttl></channel></rss>