<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0"><channel><title><![CDATA[Simunjan Water Pipe Upgrade Set to Roll Out in Phases]]></title><description><![CDATA[<p dir="auto"><strong>Simunjan’s water upgrade has a 2029 finish line — but affected areas are expected to get a nearer-term boost from a separate tank project.</strong></p>
<p dir="auto">The elevated water tank planned for Kampung Hijrah is targeted for completion in August 2027. It is intended to help areas facing interruptions while the main pipeline works are carried out. The public announcement does not yet give a village-by-village schedule, contractor or temporary-supply plan.</p>
<p dir="auto">The main Simunjan package will replace or upgrade 73.2km of ageing pipes at RM45.7 million. It is part of a wider Samarahan distribution upgrade covering 148.3km at RM84.37 million. Some work is expected to start at the end of 2026 or early 2027, with the wider programme due to be completed in phases by 2029.</p>
<p dir="auto">Residents should treat this as a project timeline, not a promise that current disruptions have ended. Keep following JBALB and local-authority notices, record the dates and locations of outages, and expect temporary access or supply changes once construction reaches an affected area. The next useful updates are the formal start notice, tank progress and the first list of pipe sections under construction.</p>
<p dir="auto"><img src="https://kuchinghub.com/assets/uploads/files/1787706573885-simunjan-water.jpg" alt="" class=" img-fluid img-markdown" /><br />
<img src="https://kuchinghub.com/assets/plugins/nodebb-plugin-emoji/emoji/android/1f4f8.png?v=732d1b4bb45" class="not-responsive emoji emoji-android emoji--camera_with_flash" style="height:23px;width:auto;vertical-align:middle" title="📸" alt="📸" /> Source: DayakDaily / TVS</p>
]]></description><link>https://kuchinghub.com/topic/1014/simunjan-water-pipe-upgrade-set-to-roll-out-in-phases</link><generator>RSS for Node</generator><lastBuildDate>Fri, 28 Aug 2026 15:43:19 GMT</lastBuildDate><atom:link href="https://kuchinghub.com/topic/1014.rss" rel="self" type="application/rss+xml"/><pubDate>Wed, 26 Aug 2026 01:09:33 GMT</pubDate><ttl>60</ttl></channel></rss>